Double heading trains on DC – the ‘dummy loco’ debate

Started by Newportnobby, Yesterday at 11:59:58 AM

Previous topic - Next topic

PLD, msr, crewearpley40 and 8 Guests are viewing this topic.

geoffc

I have three pairs of locos that run as powered plus dummy, albeit they haul one or two wagons.
The dummy Farish class 20s and 37s have had the motors and gears removed and haul one and two nuclear flask wagons respectively.
The Dapol class 153 defied all attempts to remove the faulty motor so the gears were removed from the bogies so that they free wheel but I left the pickups so I could have lights on the unit, this is hauled by another class 153.

Geoff 

Trainfish

Quote from: Newportnobby on Yesterday at 11:59:58 AMSpeed matching for me is putting two locos on an oval of track and seeing whether one catches up with the other. Even if they're close, it's still not something I tend to do. Just take a motor out of one of them, I hear you say. Simples.

This is exactly what I do, run 2 on the same track and see if they run at similar speeds. Here are some very old videos of my double headers which run absolutely fine using this method:




Anyone who watches my videos will know I have a 'thing' about car transporters, usually Ford cars involved, and with my Cartic rake which is loaded with 112 Oxford Diecast cars and my Kato rake with 104 OD cars I often use double heading as it definitely helps with what are very heavy trains.

I have also used the 1x powered, 1x dummy method and in this case I usually push the dummy with the powered loco as I find they run better that way especially if the dummy is a Dapol 73 which is very light.

I may video some more later today (depends if I go to the pub instead). Or tomorrow (depending on whether or not I go to the pub instead). Or maybe another day (when I'm on call and not allowed to go to the pub).

And finally. I think I have only ever run 1 train top and tailed and it seems to run fine by me. Some of you will have seen it before but here it is in case you missed it:

John

To see my layout "Longcroft" which is currently under construction, you'll have to click on the dead fish below

<*))))><


See my latest video (if I've updated the link)   >> here <<   >> or a random video here <<   >> even more random here <<

Please Support Us!
February Goal: £100.00
Due Date: Feb 28
Total Receipts: £56.17
Below Goal: £43.83
Site Currency: GBP
56% 
February Donations