Am I being over enthusiastic?

Started by petercharlesfagg, April 25, 2013, 06:54:36 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

petercharlesfagg

Friends,

Things are coming together to form my train the "Golden Arrow".

I am intending to have behind the locomotive (Dapol Britannia "William Shakespeare") a GUV + 8 coaches.

Is this a tad over enthusiastic?

I WILL try it and see but what are others thoughts?

In a recent video I also watched the same train in real life hauling the same set-up plus 2 other coaches at the rear which I assume are the Second Class carriages for the less well off?

Regards, Peter.
Each can do but little, BUT if each did that little, ALL would be done!

Life is like a new sewer pipe, what you get out of it depends on what you put into it!

A day without laughter is a day wasted!

scotsoft

I cannot say for your loco Peter but here is a video of a Minitrix Britannia hauling a few coaches  ;)


Minitrix Britannia pulling 14 coaches

cheers John.

davieb

Hi Peter  :wave:

The Dapol Brittania that I have will pull 7 Farish  Mk1s
Or a mix of 4 Mk1s and 4 Dapol Gresleys without breaking into a sweat  :thumbsup:

So I don't think 1 more GUV would make a difference  :hmmm:

dave  :thumbsup:

EtchedPixels

If they are the old Poole (UK build) pullmans they you may have to check all the wheels spin freely and sort any problem ones but I don't think you'll have a big problem unless you've got steep gradients on the layout.

Alan
"Knowledge has no value or use for the solitary owner: to be enjoyed it must be communicated" -- Charles Pratt, 1st Earl Camden

MJKERR

I have had locomotives haul ridiculous numbers of coaches and wagons on level track
However, as above, as soon as you introduce an incline various factors have to be taken into account
In some cases this reduces the number of coaches and wagons to about 12
Furthermore, add a curve on that incline and you may even have to half that amount

Therefore the only way to know is to create a test incline and the maximum train length you plan to operate
If it is not possible then you may need to amend your plans

Please Support Us!
July Goal: £100.00
Due Date: Jul 31
Total Receipts: £53.45
Below Goal: £46.55
Site Currency: GBP
53% 
July Donations