Fruitful time and great pleasure!

Started by petercharlesfagg, July 26, 2015, 09:23:38 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.


MikeDunn

EEk !  I think I'd have put each pair of wires in cable shrink, just to be sure I had the right pairs together !

petercharlesfagg

#17
Quote from: MikeDunn on August 02, 2015, 11:08:16 AM
EEk !  I think I'd have put each pair of wires in cable shrink, just to be sure I had the right pairs together !

Thank you for your suggestion but since this is the first time in my life that I have undertaken anything remotely similar, just getting the wires to and from AND having electrical continuity are problems enough!

Each and every wire was placed separately as open as possible so that I have the possibility of picking up one or two and following them through.

I HAVE been writing down everything in long hand every stage of the procedure so if I need to repair or move anything I have a general idea of where everything SHOULD go, but of course the proof of the pudding and all that!

I can, though, understand your reasoning.

I have (2) more Point Position Indicators and all the LED's to wire up too!

[smg id=27761 type=preview align=center caption="SAM 4772a"]

Warmest regards, Peter.
Each can do but little, BUT if each did that little, ALL would be done!

Life is like a new sewer pipe, what you get out of it depends on what you put into it!

A day without laughter is a day wasted!

Please Support Us!
June Goal: £100.00
Due Date: Jun 30
Total Receipts: £90.67
Below Goal: £9.33
Site Currency: GBP
91% 
June Donations