Happy thread

Started by Deleted Member, March 30, 2011, 06:08:29 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Dorsetmike

I've got a raod with a row of half relief terrace houses in front of my backscene, road bridge at each end "disguise" the track vanishing rather than a tunnel.
Cheers MIKE
[smg id=6583]


How many roads must a man walk down ... ... ... ... ... before he knows he's lost!

lil chris

Yes know what you mean Mick, I have placed a road over rail bridge to hide the hole on my layout, you can hardly see it with the trees but that was the idea.
Chris H.
Lil Chris
My new layout  East Lancashire Railway
My old layout was Irwell Valley Railway.
Layout previous was East Lancashire Lines, changed this new one. My new layout here.
https://www.ngaugeforum.co.uk/SMFN/index.php?topic=57193.0

The Q

On my err um 009 layout, the line at one end goes into a tunnel with a tight U turn soon after after a bit under a hillside that's not unusual .
But then it goes through, through the back of a watermill, then through a soon to built terrace of houses, then after a Uie will appear between a hotel and a house at an angle that's almost impossible to see from the front of the layout.

Trainfish

Just checked my ULEZ account which I set up specifically for attending a funeral towards the end of April and it says both my payments and balance as £0.00 even though it says my car is chargeable at £15 per day and I was 'in the zone' for 3 days  :claphappy:
John

In April 2024 I will be raising money for Cancer Research UK by doing at least 100 press-ups every day.  Feel free to click on the picture to go to the donations page if you would like to help me to reach my target.



To follow the construction of my layout "Longcroft" from day 1, you'll have to catch the fish below first by clicking on it which isn't difficult right now as it's frozen!

<*))))><

Please Support Us!
May Goal: £100.00
Due Date: May 31
Total Receipts: £25.67
Below Goal: £74.33
Site Currency: GBP
26% 
May Donations