A question about the PECO Plan25 ... Bere Alston circuit diagram

Started by mikepaling, Today at 11:57:14 AM

Previous topic - Next topic

BlythPower, Yet_Another, PLD, mikepaling and 2 Guests are viewing this topic.

mikepaling

Can anybody please explain what the wiring inside the purple circle on the attached diagram actually .... and why.
I don't understand at the minute :-(

Cheers Mike

emjaybee

I'm not 100%, but I think the issue is that the 'plan' creates a reverse loop, so the diagram explains how to wire a switch to prevent a short circuit.

Someone with better wiring skills than I will be along shortly to confirm.
Brookline build thread:

https://www.ngaugeforum.co.uk/SMFN/index.php?topic=50207.msg652736#msg652736

Sometimes you bite the dog...

...sometimes the dog bites you!

----------------------------------------------------------

I can explain it to you...

...but I can't understand it for you.

chrism

Quote from: emjaybee on Today at 12:21:19 PMI'm not 100%, but I think the issue is that the 'plan' creates a reverse loop, so the diagram explains how to wire a switch to prevent a short circuit.

Spot on - that siding is the apex of a turning/reversing triangle, thus the polarity of that siding's rails must be switchable so that they match the polarity of the rails beyond the insulating joiners.

ntpntpntp

There is another approach you can take with a wye formation (or reverse loop) which is to arrange the DPDT switch so that R1 is fed from either the left or right branch of the wye.  Some folk find it easier to understand (rather than creating the cross-wired connections to reverse the polarity).

As is sometimes the case with Peco plans, I don't necessarily agree with all the placements of the feeds, there's often "back-feeding" of power into the frog end of points instead of following a basic rule that power should feed into the toe end (the blades end). 

Here's where I would add a feed to make it easy to access the left branch of the wye (and the DPDT switch could be connected to)


Nick.   2026 celebrating the 30th anniversary of "Königshafen" exhibition layout!
https://www.ngaugeforum.co.uk/SMFN/index.php?topic=50050.0

Please Support Us!
February Goal: £100.00
Due Date: Feb 28
Total Receipts: £56.17
Below Goal: £43.83
Site Currency: GBP
56% 
February Donations