Today I've been running Neraland 2 as a London, Brighton & South Coast layout (and my videos of my models are getting a bit better ... )
I didn't build any of the locomotives you will see in these video clips, but I painted all four of them. The rake of coaches which make up the down stopping train are the first brass coaches I built. The 6-wheelers run on Fleischmann chassis and the 4-wheelers run on modified Lima chassis. The bogie coaches are old Farish generic bogie coaches - the very early ones which were moulded in plain single-colour plastic - running on modern Bachmann wheelsets. And the horsebox in the up express is part of a job lot of "bashed" horseboxes which I bought on Ebay and identified as a LBSC type, so painted in the LBSC umber passenger livery.
Clip 1: the down stopping train arrives
https://youtu.be/GRTFcI0nPZQ
Clip 2: the up goods arrives
https://youtu.be/OGyCbBzeSx4
Clip 3: the goods sets back into the headshunt to clear the road for the up express
https://youtu.be/E7ScT133g3k
Clip 4: the up express passes through
https://youtu.be/Wi0atBQuhvw
Clip 5: the down stopper departs
https://youtu.be/eDS37vJ0JWw
Clip 6: the down semi-fast passes through
https://youtu.be/bb_thnQz-bI
Clip 7: the road is finally clear for the up goods to continue on its way
https://youtu.be/U4hBrcAzC0Q