Mine is to make up the pile of kits I've been hoarding over the years and to try and keep the railway room tidy (an on-going problem) another one should be not to be tempted by 'bargains'
Regards and Happy New Year to everyone,
Veronica
None.
And if I had any I would surely break them.
I will resist the ever growing number of mouth-watering pre-grouping OO releases, one day they will come out in N.
I will resist the ever growing number of mouth-watering pre-grouping OO releases, one day they will come out in N.
I will resist...
Just to try and do some :(
To start work on building the layout...
Happy New Year...
Cheers Timmo
Not much point as I am very week willed when it comes to a loco I like :-[
cheers John.
Same as Lawrence - Doing some modelling would be an improvement...
Quote from: silly moo on December 31, 2013, 09:59:02 AM
Mine is to make up the pile of kits I've been hoarding over the years and to try and keep the railway room tidy (an on-going problem) another one should be not to be tempted by 'bargains'
Regards and Happy New Year to everyone,
Veronica
Well that saved me from typing!!! :thumbsup: :thumbsup: :thumbsup:
Happy New year to All
Plod on regardless.
If it dosnt fit make it (gently)
Try-fit-retry-refit keep calm-have a caffeine fix. repeat from part one.
check/check check/ recheck and glue/pin etc
Warning Locos break windows if you throw them hard enough
Just keep calm and it will work out ok in the end
As per Lawrence and Greybeema - I must stop playing trains is the 2014 mantra (but we ain't there yet :P)
Rebuild my main station area.
NOT start on a major port extension to Port Perran until I retire in 11 months (MUST resist the temptation to start!).
I'll be spending my time concentrating on a 5" Gauge garden railway. I'm building 3 Ford style pallet vans at work (during breaks of course!).
I'd make a build thread, but I think it'd be frowned upon on here. ;D Hopefully I can get into the loft and see my n gauge at some point.... :'(
Not to cut up any more locos. :uneasy:
Use the stock of chassis I already have.
Build some more of the kits and not buy any more. :smiley-laughing:
Scratch build more stuff using stuff that would have been thrown away.
Finish off the rest of the hand laid track I need.
Some hope and NO hope of keeping some of the above.
Quote from: tutenkhamunsleeping on December 31, 2013, 10:26:37 AM
I will resist the ever growing number of mouth-watering pre-grouping OO releases, one day they will come out in N.
I will resist the ever growing number of mouth-watering pre-grouping OO releases, one day they will come out in N.
I will resist...
I will keep producing pre-group N gauge kits to tempt you into the land of kit building >:D
To get the track down on the layout !!! And then start the scenic details ...
to try and do some modelling, will be starting a new layout soon once the boards are ready, thread to possible follow.
Yea
To FINALLY get mine underway
In 2014 I will:
Dismantle my layout
Test and play with stock more
Buy more stock
Reason being, last year I said the complete opposite to the above and it never happened! Thought I'd change tack!
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Oh and don't buy anymore rolling stock or engines except perhaps those parcels wagons
Quote from: rhysapthomas on December 31, 2013, 05:53:43 PM
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Do not start a new project until the current one is finished
Oh and don't buy anymore rolling stock or engines except perhaps those parcels wagons
think that works for me :smiley-laughing:
to keep this layout more than 6 months before scraping it , and stick to a era and area .
i hope although i said that last year i think?
Finish my layout instead of building others peoples layouts
bart
Quote from: port perran on December 31, 2013, 11:34:10 AM
Rebuild my main station area.
NOT start on a major port extension to Port Perran until I retire in 11 months (MUST resist the temptation to start!).
What do you want to do with your main station area, Mike?
I've just emailed you a map of the proposed (1983) Padstow - Newquay - Truro line to help plan your major port extension? (I've also attached draft plans for Cant Cove and Penmayne.)