Proses Nelevator equivalent coming?

Started by ntpntpntp, March 31, 2025, 04:39:42 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

ntpntpntp

I see Proses are starting to advertise a vertical lift unit for pre-order.   Just a single deck to begin with but apparently a multi-deck version later.   Could be the answer for those wanting something like the Nelevator.

https://proses.com/shop/helix-systems/330-30-singledouble-helix-r28-to-r32.html

Nick.   2021 celebrating the 25th anniversary of "Königshafen" exhibition layout!
https://www.ngaugeforum.co.uk/SMFN/index.php?topic=50050.0

RailGooner

IMAO they're right to pitch it as an alt to helices - KISS.

Skyline2uk

I saw this last month, seems like a good idea and if my maths is right (dubious) it can be made long enough for full length HSTs in N.

I may have made a track design that makes use of this already  :hmmm:

Skyline2uk

Chrich

Hey there,

this reminds me of
https://joeschwarz.ch/.
Seen his elevator-displays in Friedrichshafen in November 2024, and he will be in Dortmund for Intermodellbau next week. Looking forward to discuss a possible use with him.
No idea about a pricetag yet  :angel:

Cheers, Christian

njee20

Those appear to just be display cases? Which are nothing like the Proses/Nelevation solution...  ???

Chrich

You're right, sorry. The webpage focusses on the standard displays. This might give a better idea:

Facebook1

Facebook2

The moving display absolutely impressed me on the fair.

Chris

F2Andy

Interesting at has three stop positions. I wonder how many people would use all three.

ntpntpntp

Quote from: F2Andy on April 03, 2025, 10:05:46 AMInteresting at has three stop positions. I wonder how many people would use all three.
Depends how many levels of fiddleyard you want to create?   Personally I would prefer the Nelevator approach of multiple decks as the storage and just the one level of entry/exit. Not so bothered about actually driving on/off other levels.
Nick.   2021 celebrating the 25th anniversary of "Königshafen" exhibition layout!
https://www.ngaugeforum.co.uk/SMFN/index.php?topic=50050.0

Sharkey51

#8
My DIY elevator (that can be seen at

https://youtu.be/m_bkciU72-8) has 10 levels. It's successor, now in the course of manufacture, will have 15 levels and be about 10cm longer to accommodate longer rakes. I store all my stock on the elevator and can introduce any consist to the layout as I please. there is no way that I could find the space for an equivalent fiddle yard..

Newportnobby

As it stands the Proses item purely replaces a helix (i.e. changes levels). It is not a fiddle yard, unlike the Nelevator and Sharkeys excellent home build.
I'll be keeping an eye open for future products, though, as it would be great to replace my ladder fiddle yard with something 'off the shelf'

Please Support Us!
April Goal: £100.00
Due Date: Apr 30
Total Receipts: £104.56
Above Goal: £4.56
Site Currency: GBP
105% 
April Donations