Channel Tunnel Terminal - N Gauge Display

Started by NGS-PO, September 19, 2019, 11:03:50 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Luke Piewalker

I'm sure I remember reading somehwere that the trains on the exhibition layout were doing 21 actual miles a day or something ridiculous like that.

Graham

did they ever send this out to other exhibitions, I have a vague memory of seeing this at a show in Bletchley in the very early 90's on one of my trips back to the UK.

Bealman

Vision over visibility. Bono, U2.

njee20


Bealman

No, otherwise I would have started my layout with it.

I think that flexible lengths had been introduced, but no pointwork existed.

Let's not forget that Code 55 is Code 80 anyway!!
Vision over visibility. Bono, U2.

ntpntpntp

Quote from: Graham on September 20, 2019, 08:08:50 AM
did they ever send this out to other exhibitions, I have a vague memory of seeing this at a show in Bletchley in the very early 90's on one of my trips back to the UK.

No, way too large for that!  It was a permanent layout at the exhibition centre.
Nick.   2021 celebrating the 25th anniversary of "Königshafen" exhibition layout!
https://www.ngaugeforum.co.uk/SMFN/index.php?topic=50050.0

GrahamB

Ah memories!

I worked on the Channel Tunnel construction project from November '88 until a year after it opened. The Exhibition Centre and the viewing gallery was required by the Government to educate and inform. Although they could charge to go into the Exhibition Centre, the viewing platform was free.

If I remember correctly there were two guys working full time keeping it all running.

Nice to see it wasn't scrapped.

At the end of the project a Tunnel Boring Machine (Well, the business end) was placed next to the Exhibition Centre with a notice offering it for sale as "One owner, low mileage."   :o
Tonbridge MRC Member.
My Southwark Bridge thread can be found at https://www.ngaugeforum.co.uk/SMFN/index.php?topic=38683.0
My Southwark Bridge website can be found at https://southwarkbridge.wixsite.com/ngauge

Please Support Us!
April Goal: £100.00
Due Date: Apr 30
Total Receipts: £50.23
Below Goal: £49.77
Site Currency: GBP
50% 
April Donations