what are people doing on their layout right now

Started by B1 61126, August 16, 2011, 07:59:35 PM

Previous topic - Next topic

0 Members and 2 Guests are viewing this topic.

The Q

Technically as I'm temporarily 400 miles from the layouts not a lot.
But, soon...

Tiree (N) at the MRC , is waiting for me to do interboard wiring, and add one non scenic track.

Heigham Furlgate (N), I've been designing a support system for the layout, once that's made, it's dropper installation time, plus river bank scenery. The boards are too short for fold up legs... Other solutions are required.

DeCoville (009) work temporarily suspended as HF has a higher priority till the weather gets cold. HF is in the mobile home and I won't be heating it just for a couple of hours in the winter, DC is in the house..

Ludgershall ( EM) has been in long term suspension due to rats eating through the floor of the shed and the sheds back door. Hopefully this has been solved, but there is a lot of clearing up to do before work can restart next summer.


KevTheBusDriver

When I was exhibiting at TINGS, I spotted a very nice-looking 3D-printed lattice footbridge by MDN Designs - but they'd sold out on Saturday, so I ordered a couple of kits on 20 Sept; they arrived today and I've been hacking them into something resembling the footbridge at Pelsall on the South Staffs line. I've managed to extend the deck, joined 2 lots of steps together and also joined 2 of the 'piers' together - it looks ok so far... the painted bit is just a test...
In the event I found I've only used the 'double arch' kit (the double kit is 2 'single arch' kits as far as I can tell). Single kit was £15, double £20.



Please Support Us!
November Goal: £100.00
Due Date: Nov 30
Total Receipts: £33.45
Below Goal: £66.55
Site Currency: GBP
33% 
November Donations